- FIRM: EHM Mimarlık Sti.
- CUSTOMER: Yolbulan Holding AŞ.
- LOCATION: Dilovası – Kocaeli
- SCOPE: Steel Structure project
- ROLE: Head of Steeel construction Project Group
Portfolio
YOLBULAN HOLDİNG LOJİSTİK DEPO NO-5
Leading a group of designers we have completed the 17.000m2 roof project. 983 tonnes with 15m length triangular roof trusses and various steel details.
Currently working on the steel under structure for the facade panelling and fire escape stairs.
KEMERBURGAZ – LOGİSTİCS DEPOT
- FIRM: EHM Mimarlık şti.
- CUSTOMER: EMTA gayrımenkul.
- LOCATION: Kemerburgaz- İstanbul
- SCOPE: Architectural and Structural Project – Construction
- ROLE: Head Architect & Prime Contractor
Designed and Built 1800m2 logistics depot that consists of building halls that can be enclosed and divided in different ways so that the client that rented can customize it for their using purpose.
AVRUPA KONUTLARI - YAMANEVLER 2. ETAP - RECREATİONAL FACİLİTY
- FİRM: EHM Mimarlık şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Ümraniye- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and site supervised the steel construction of enclosed swimming pool and sports complex roof and façade covered with glass.
SALCANO BİSİKLET – ALİBEYKÖY FACTORY
- FİRM: EHM Mimarlık şti.
- CUSTOMER: SALKANO BİSİKLET AŞ.
- LOCATION: Büyükkarıştıran – Kırklareli
- SCOPE: Architectural project
- ROLE: Head Architect & Head of the Project Group
- Lead the Architecture & Project Group for the SALCANO Bicycle factory & Office Buildings (9 blocks total) we provided the Architectural project, Structural concrete, Structural Steel project, Panel roofing and Panel facade projects. Coordinated the Electrical and Mechanical engineering and Glass Façade projects. Handled the licence process and supervised the site for project revisions.
Links:
AVRUPA KONUTLARI - YAMANEVLER 1. ETAP - RECREATİONAL FACİLİTY
- FİRM: EHM Mimarlık şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Ümraniye- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and site supervised the steel construction of enclosed swimming pool roof covered with glass and sunk in the ground level of the housing complex.
Vadistanbul – VadiAçıkhava Event Stage
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Kağıthane- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and site supervised the construction of a 20m tall 32 m wide 18m deep steel construction event stage which is rated for the highest hanging loading for screens, sound and lighting equipment in Turkey.
Kömürcüoda LFG Energy Plant
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Kağıthane- İstanbul
- SCOPE: Architectural Project
- ROLE: Head Architect
- Led a team of 3 specialists for the architectural and structural projects of a 4000 m2 LFG (landfill gas) plant main generator and control buildings; in close collaboration with electrical and mechanical engineers under the highest safety and security regulations.
Link:
Vadistanbul – 1.Etap to 3. Etap Bridge and walkway covering
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Kağıthane- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and supervised the construction of an enclosed walkway that is on top of a concrete bridge.
Vadistanbul – Gallerie Lafayette (Later bought by BEYMEN) Extension building
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ARTAŞ holding AŞ. – YOO Mimarlık
- LOCATION: Kağıthane- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and supervised the construction of extension building that connected two of the skyscraper towers. It sat on top of a garage structure and an expansion joint was running through the middle of the building so the building had to be designed in way that will move with the settlement but won leak water from the expansion joints. Because of the irregular shape requested by the user the parking structure must have been strengthened and additional steel columns used. The whole operation was carried between the houses of 10.00pm and 06.00am because of the shopping malls working hours.
LINKS :
https://www.yoointerior.com/en/beymen-vadi-istanbul-mall
OTİM Building Complex
- FİRM: AKTEPE İNŞAAT AŞ.
- CUSTOMER: AKTEPE İNŞAAT AŞ.
- LOCATION: Mecidiyeköy- İstanbul
- SCOPE: Architectural Project
- ROLE: Head Architect
Supervised the creation of a series of Architectural project proposals; that varied from included repurposing some of the buildings of the old OTİM complex to deconstruction and building a new hotel complex in the on site of OTİM complex. In the end funding is withdrawn by the investor because of the municipal problems.
Vadistanbul – Galatasaray Stadium Metro & Monorail Connection Station
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ARTAŞ holding AŞ.
- LOCATION: Kağıthane- İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed and supervised the construction of monorail station roof steel structure for the Judicial metro to monorail connection of the Vadistanbul shopping mall.
PROTERM ENERJİ – THERMAL POWER PLANT HQ BUILDING
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: ENKA Holding AŞ.
- LOCATION: Kandıra – Adapazarı
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed floating glass covered steel walkways that connected the wings and floating steel stairs inside the H.Q. building.
Links:
https://www.gadarchitecture.com/tr/enka-power-station-hq–adapazari
BEKAP STEEL- DECOİLER MACHİNE FUNDATİONS
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: BEKAP METAL AŞ.
- LOCATION: Gebze – Kocaeli
- SCOPE: Concrete Foundation Project
- ROLE: Head Of Design Group
- Designed a special free floating foundation suspended in a sand bunker for one of the Turkey’s largest steel decoiling machine.
ÇINAR TERMAL AFYON
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: Çınar Thermal İşletmeleri
- LOCATION: Gazlıgöl – Afyonkarahisar
- SCOPE: Steel Structure project
- ROLE: Steel Construction Designer and Site manager
- Designed a special roof structure the cover the sulphuric thermal pools with galvanised steel and as little connections as possible for rust proofing. And supervised the construction on site.
PARK AFYON AVM
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: Afyon Girişm Grubu
- LOCATION: Afyon Merkez – Afyon
- SCOPE: Steel Structure project
- ROLE: Head of Steel Structure project group – and technical coordinator
- Supervised the design group that was responsible for steel construction projects of a 17.000-m2, 1570-ton roof structure, a 12-sloon cinema structure and facade underworks. And organised the fabrication and logistical shipping program by liaison with the customer and two factories working for the fabrication.
Anadolu Metro - TMB Pushing Chasis
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: Doğuş İnşaat ve Yatırım Aş.
- LOCATION: Ümraniye – İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Structure designer
- Designed special pushing chassis that can be assembled in the metro tunnel confines for TBM (tunnel boring machine) to use in stations to move on the next part of the tunnel construction.
Azerbaijan – National Gymnastics Arena
- FİRM: Sinerji İnşaat AŞ.
- CUSTOMER: Pasha Construction
- LOCATION: Bakü – Azerbaycan
- SCOPE: Steel Structure – EPDM Membrane covered roof & Facade
- ROLE: Chief Site Manager
- Supervised the steel construction of enclosed stadiums dome and the membrane coverings of roof and façade works.
Links:
https://agf.az/en/about/national-gymnastics-arena/
https://en.wikipedia.org/wiki/National_Gymnastics_Arena
https://archello.com/project/national-gymnastics-arena
D-İNŞAAT TRUMPH CADDE FOOD COURT EXTENSION
- FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
- CUSTOMER: GAD. Mimarlık
- LOCATION: Mecidiyeköy – İstanbul
- SCOPE: Steel Structure project
- ROLE: Steel Structure designer
- Designed a light steel structure that consists two cantilevered shipping containers used as shopping areas
Links:
https://www.archdaily.com/494695/trump-cadde-gad/5344aa72c07a8091a0000335-trump-cadde-gad-photo?next_project=no
SAĞLAM METAL -BALIKESİR CASTİNG FACTORY
FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
CUSTOMER: SAĞLAM METAL DÖKÜM AŞ.
LOCATION: Balıkesir Osg. – Balıkesir
SCOPE: Architectural Project– Steel Structure project
ROLE: Architect
- Designed twin 15.000m2 factory buildings that houses casting machines and 50 tonnage capacity bridge cranes. And the roofs are solar power stations.
Anadolu Metro Segment factory - Concrete Curing Hall Extension
FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
CUSTOMER: Doğuş İnşaat ve Yatırım Aş.
LOCATION: Ümraniye – İstanbul
SCOPE: Architectural Project– Steel Structure project
ROLE: Architect
- Designed a environmentally controlled special hall that is used for speed curing the concrete metro tunnel segments for TBM (tunnel boring machine)
Beykoz Film Platosu
FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
CUSTOMER: YENİ YAPI AŞ.
LOCATION: Beykoz – İstanbul
SCOPE: Architectural Project– Steel Structure project
ROLE: Architect and head of design group
- Designed a hanger space for film shooting. İnterior is clad with special acoustic panels and roof has integrated cat walks for lighting and sound equipment.
SAĞLAM METAL -TUZLA CASTİNG FACTORY FORGİNG ROOM EXTENSİON
FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
CUSTOMER: SAĞLAM METAL DÖKÜM AŞ.
LOCATION: TUZLA – İstanbul
SCOPE: Architectural Project– Steel Structure project – Steel Construction
ROLE: Architect – Site Manager
- Designed a special extension building that houses 2 giant steel forging hammers. And supervised construction on site.
SALCANO BİSİKLET – ALİBEYKÖY FACTORY
FİRM: Tmm Mimarlık Mühendislik ltd. Şti.
CUSTOMER: SALKANO BİSİKLET AŞ.
LOCATION: Alibeyköy – İstanbul
SCOPE: Concrete Structure – Steel Structure – Panel Roofing
ROLE: Site Manager in Charge of Steel Construction
- Supervised the onsite construction of 155 ton roof steel construction and roof cladding of the 2500m2 roof.
DHL - Gebze Logistics Centre
FİRM: Tobasan Celik A.S.
CUSTOMER: DHL Turkiye
LOCATION: Gebze – İstanbul,
SCOPE: Steel Construction
ROLE: Steel Constructions Supervisor Assistant
- 17.000m2 of Autonomous warehouse building. We were responsible for the 1180 tons of steel roof structure construction.
OMSAN - Tuzla Logistics Centre
FİRM: Tobasan Celik A.S.
CUSTOMER: Omsan Logistics,
LOCATION: Tuzla – İstanbul,
SCOPE: Steel Construction
ROLE: Site Manager’s Assistant
- 12.000m2 Logistics depot 980 tons of steel construction.
Sapphire Tower Skyscraper
FİRM: Tobasan Celik A.S.
CUSTOMER: Kiler Holding,
LOCATION: Levent – İstanbul,
SCOPE: Steel Construction
ROLE: Site Manager’s Assistant
- With the height of 261 meter, it’s Türkiye’s highest building.
- 1700 tons facade and floor steel stucture.